Deck permits in the City of Madison
Review zoning first, then schedule a permit counter appointment with the city. Madison requires a registered survey for lakefront properties.
Official sources checked
On this page
Where to submit and what to include
Where to file
Building Inspection Permit Counter
Check Madison zoning firstSchedule a permit counter appointment
Check zoning and setbacks first. Then book a permit counter appointment at the Madison Municipal Building, 215 Martin Luther King Jr. Blvd., Suite 017.
What to include
- City deck data sheet (PDF)
- Scaled construction drawings showing deck size, post locations, beam sizes, and joist size and spacing.
- Prepare a scaled site plan at 3 feet above grade or higher, per the city’s deck data sheet.
Do I need a permit?
New deck: permit required. Deck-board replacement under $500 can be exempt. For stairs, joists, beams, columns or guards, obtain a permit or check the scope with Building Inspection.
Deck code and local rules
Code to draw to
Wisconsin UDC SPS 321.225 covers decks attached to dwellings and detached decks serving an exit. Use SPS 321 or its applicable Appendix B and C details. DSPS also recognizes AWC DCA 6 based on the 2012 IRC as a design option.
Wisconsin deck code · Wisconsin span charts · Deck design options explained by Sun Prairie
Local rules and footing depth
- Madison calls for deck footings at least 48 inches deep and a footing inspection after digging, before installation.
- Arrange site plan review with Zoning. Lakefront sites require a survey by a registered land surveyor and setbacks measured from the ordinary high-water mark.
Under Wisconsin Appendix B, place the footing bottom at least 48 inches below finished grade or below frost penetration, whichever is deeper. Appendix B footing rule (PDF)
What to show on the drawings
Show the deck size, post locations, beam sizes, and joist sizes and spacing on scaled construction drawings. Keep the deck and stair locations consistent with the site plan reviewed by Zoning.