Skip to content
DeckDraft
Wisconsin deck permits

Deck permits in Dane County

Check rural Dane County zoning and find the building permit office for your city, village, or town.

Official sources checked

On this page

Municipal permit index

Select the city, village or town on the parcel record for the permit rules and drawing checklist. Search by municipality

MunicipalityWhere to fileWhat to includeLocal rules
City of EdgertonDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-884-3341

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
City of FitchburgDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-270-4241

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
City of MadisonFiling instructionsPermit guideWhere to fileBuilding Inspection Permit CounterCheck Madison zoning firstSchedule a permit counter appointment

Check zoning and setbacks first. Then book a permit counter appointment at the Madison Municipal Building, 215 Martin Luther King Jr. Blvd., Suite 017.

Fee: $75 for most decks under 250 sq. ft. The city calculates the final fee after plan review.

What to include
  • City deck data sheet (PDF)
  • Scaled construction drawings showing deck size, post locations, beam sizes, and joist size and spacing.
  • Prepare a scaled site plan at 3 feet above grade or higher, per the city’s deck data sheet.
Local rules

Lakefront lots need a registered survey. Decks 3 ft or higher need a scaled site plan.

Official local requirementsCounty zoning informationWisconsin deck code
City of MiddletonDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-821-8397

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
City of MononaDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-222-2525

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
City of StoughtonDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-577-1893

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
City of Sun PrairieFiling instructionsWhere to fileCity of Sun Prairie Building InspectionApply in Sun Prairie’s OpenGov portal

Submit the building permit application and drawings through the city’s OpenGov portal.

What to include
  • Completed building permit application.
  • Deck drawings showing compliance with one of the design paths listed by the city: Wisconsin SPS 321.225, UDC Appendix B and applicable Appendix C, or the 2012 IRC-based AWC DCA 6 path.
  • Site plan locating the lot lines, existing buildings, and proposed deck.
Local rules

The city lists different rear setbacks for decks up to 3 feet high and decks over 3 feet. Roofed decks and some subdivisions have additional requirements.

Check side and rear setbacks with the city, especially if the project adds a roof. The city also flags possible subdivision approval. City deck setbacks and zoning checks

Official local requirementsWisconsin deck code
City of VeronaDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-516-1251

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of AlbionFiling instructionsWhere to fileTown Building Inspector · Steve KittelsonDownload the Albion permit packet (PDF)

Mail the application and a check payable to Town of Albion to Steve Kittelson at 1126 Eldon Way, Edgerton, WI 53534.

Separate county zoning: Email the county zoning packet
What to include
  • Signed application with the parcel number, project size, estimated cost and contractor information.
  • Plan showing lot lines and deck dimensions.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of BerryDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-767-4152

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of Black EarthFiling instructionsWhere to fileJohnson Inspection · Tracy JohnsonGet Dane County zoning approval when requiredApply through Johnson Inspection

Apply and pay through Johnson Inspection. Choose the Town of Black Earth for the job address.

Separate county zoning: Email the county zoning packet
What to include
  • Two sets of plans showing setbacks and existing structures.
  • Two copies of the erosion-control plan shown on the survey.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of Blooming GroveFiling instructionsWhere to fileCity of Madison Building InspectionApply through Madison ePermits

Submit and pay through Madison’s ePermits portal. Use the Town of Blooming Grove job address.

Separate county zoning: Email the county zoning packet
What to include
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Madison took over building permits and inspections for the town on January 1, 2026. Check setbacks and zoning for the town parcel separately.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of Blue MoundsFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of BristolDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-837-6494

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of BurkeFiling instructionsWhere to fileGeneral Engineering Company · Jim TrebianApply through General Engineering Company

Submit the building permit through the General Engineering Company link on the town’s forms page.

Ask Jim Trebian which drawings your deck needs. Call Burke’s building inspector

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of ChristianaFiling instructionsWhere to fileGeneral Engineering CompanyApply through General Engineering Company

Use General Engineering Company’s building permit application for construction or an addition. Select the Town of Christiana.

General building permit form (PDF)Separate county zoning: Email the county zoning packet
What to include
  • Project description, building plans and site plan.
  • List applicable approvals and the county zoning permit number when required.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of Cottage GroveFiling instructionsWhere to fileGeneral Engineering Company, Town Building InspectionSubmit the town building permit online

Submit the building permit through General Engineering’s online application. The inspector contacts you with the fee once the permit is ready.

Separate county zoning: Email the county zoning packet
What to include
  • General building permit application and deck plans.
  • Provide the applicable zoning permit number and supporting documents.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The town lists decks as work requiring a building permit. Follow the county zoning instructions for the parcel.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of Cross PlainsFiling instructionsWhere to fileJohnson Inspection · Tracy JohnsonApply through Johnson Inspection

Submit projects that require a building inspection through Johnson Inspection.

Confirm which deck drawings and inspections apply. Call Cross Plains’ building inspector

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The town requires a permit for construction estimated at $1,000 or more, or for work involving electrical, plumbing, heating or air conditioning. Ask the inspector how the town classifies your deck.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of DaneFiling instructionsWhere to fileMSA Professional ServicesApply through MSA’s permitting portal

Submit through the MSA permitting portal. Select the Town of Dane and complete the applicable building permit application.

Separate county zoning: Email the county zoning packet
What to include
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Forms and instructions
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of DeerfieldZoning instructionsWhere to fileTown Building Inspector · Steve ReweyEmail Deerfield’s building inspectorTown permit short form (PDF)

Get the building permit from Steve Rewey. Confirm where he wants the completed packet and whether your deck can use the town’s short form.

Ask which form to use and where to submit it.

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of DunkirkFiling instructionsWhere to fileTown Building Inspector · Steve KittelsonGet Dane County zoning approval when requiredDownload the Dunkirk permit packet (PDF)

File the town deck application with Steve Kittelson. Mail the check payable to Town of Dunkirk to 1126 Eldon Way, Edgerton, WI 53534.

The town directs applicants to call the inspector about permits and inspections. Call Dunkirk’s building inspector

Separate county zoning: Email the county zoning packet
What to include
  • One set of plans showing the lot lines and deck dimensions.
  • Contractor names, addresses and phone numbers.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of DunnFiling instructionsWhere to fileTown of Dunn Building PermitsGet Dane County zoning approval when requiredEmail the building permit packet

Email the packet to egreenfield@townofdunnwi.gov or deliver it to 4156 County Highway B, McFarland, WI 53558. The town hall drop box is by the mailbox.

Download the Dunn building permit application (PDF)Separate county zoning: Email the county zoning packet
What to include
  • Town application, detailed project description, site plan and any applicable drawings. The town prefers electronic drawings.
  • Both pages of any applicable Dane County permits.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of MazomanieFiling instructionsWhere to fileJohnson Inspection · Tracy JohnsonApply through Johnson Inspection

After the town and Dane County approve your site plan, apply and pay online through Johnson Inspection.

Separate county zoning: Email the county zoning packet
What to include
  • Site plan for town and county review. For a project that needs town approval, send the scheduled meetings form to the town clerk.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The town lists additions to existing buildings for Land Plan Commission and Town Board approval. Agenda materials are due two weeks before the meeting.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of MedinaFiling instructionsWhere to fileTown Building Inspector · Steve ReweyGet Dane County zoning approval when requiredDownload Medina’s construction permit short form (PDF)

Mail the town construction permit to Steve Rewey, 761 Coyote Ct, Deerfield, WI 53531. The town’s addition checklist also allows drop-off at that address.

Ask whether your deck can use the short form. Email Medina’s building inspector

Separate county zoning: Email the county zoning packet
What to include
  • Town application with project scope, square footage, estimated cost and contractor credentials.
  • If the deck is filed as an addition, include two sets of drawings and a copy of county zoning approval.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Forms and instructions
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of MiddletonFiling instructionsWhere to fileJohnson Inspection, Town Building InspectionStart the town deck permit in Johnson Inspection’s portal

Use the inspector’s portal linked under Decks—Adding or Replacing Building Permit on the town’s construction permits page.

Separate county zoning: Email the county zoning packet
What to include
  • Building permit application and deck drawings.
  • Submit supporting documents as PDFs.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The town accepts PDF scans for submitted applications. Include your email address and check Dane County zoning requirements.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of MontroseZoning instructionsWhere to fileTown Building Inspector · Todd ParkosEmail Todd ParkosDownload the building permit application (PDF)

Use the building permit form listed by the town. Ask Todd Parkos how to deliver the signed application and plans.

Confirm the filing method and deck drawings.

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Forms and instructions
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of OregonZoning instructionsWhere to fileSAFEbuilt · Town Building InspectionContact Town of Oregon Building InspectionDownload the town’s SAFEbuilt application (PDF)

Use the SAFEbuilt application on the town’s forms page. Confirm how to send the application and deck drawings to SAFEbuilt.

Ask SAFEbuilt for the deck filing method.

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of PerryZoning instructionsWhere to fileTown Building Inspector · Todd ParkosEmail Todd ParkosDownload the uniform building permit application (PDF)

File the building permit with Todd Parkos, 310 North Kenzie Street, Barneveld, WI 53507. Use the contact on the town’s inspector page to arrange delivery.

Confirm how to deliver the form and which drawings to include.

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Forms and instructions
Local rules

Perry requires the inspector’s permit for attached and freestanding decks. Some projects also need a separate town permit and Dane County zoning approval.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of Pleasant SpringsFiling instructionsWhere to fileTown Building Inspector · Steve KittelsonDownload the Pleasant Springs application (PDF)

Call the inspector to begin. Mail the application and payment to Steve Kittelson at 1126 Eldon Way, Edgerton, WI 53534.

Call to start the permit process. Call Pleasant Springs’ building inspector

Separate county zoning: Email the county zoning packet
What to include
  • Signed building permit application with parcel and contractor information.
  • Plan showing lot lines and deck dimensions.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of PrimroseFiling instructionsWhere to fileTown Building Inspector · Todd ParkosEmail the Primrose building permit application

Email the completed application to Todd Parkos and copy the town clerk using the address on the town’s permits page.

Download the Primrose building permit application (PDF)Separate county zoning: Email the county zoning packet
What to include
  • Plot plan showing the deck location relative to property lines.
  • One complete set of plans to scale.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The inspector gives you the fee after review. Mail the check payable to Town of Primrose to 8468 County Road A, Verona, WI 53593.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of RoxburyZoning instructionsWhere to fileMSA Professional Services · Stephanie PotterCall Roxbury’s building inspectorDownload the uniform building permit form (Word)

Roxbury lists MSA Professional Services for building permits. Confirm how to send your application to the inspector.

Confirm where to submit the building permit and plans.

Separate county zoning: Email the county zoning packet
What to include
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of RutlandFiling instructionsWhere to fileTown Building Inspector · Steve KittelsonGet Dane County zoning approval when requiredDownload the Rutland building permit application (PDF)

Use the town form and file with Steve Kittelson at 1126 Eldon Way, Edgerton, WI 53534. Make the check payable to Town of Rutland.

Separate county zoning: Email the county zoning packet
What to include
  • One set of deck drawings, total square footage and cost.
  • Contractor names, phone numbers and certification numbers.
  • County zoning and sanitary approval when applicable.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of SpringdaleFiling instructionsWhere to fileGeneral Engineering Company · Chris MichaelsGet Dane County zoning approval when requiredApply through General Engineering Company

Submit the building permit through General Engineering Company. Mail the permit fee to the town at 2379 Town Hall Road after the inspector calculates it.

Confirm the drawing packet and whether your deck needs separate town approval. Email Springdale’s building inspector

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

The town lists decks as permit work. The town must process the payment before releasing the permit.

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Official local requirementsWisconsin deck code
Town of SpringfieldDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of Sun PrairieDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of VermontFiling instructionsWhere to fileTown of Vermont Planning · Johnson InspectionStart on the town’s building permit application page

Start with the Johnson Inspection application linked by the town. Email the supporting packet to planning@townofvermontwi.gov or deliver it to 4017 County JJ, Black Earth.

Email the deck permit packetSeparate county zoning: Email the county zoning packet
What to include
  • Application, project description, site plan and applicable drawings.
  • Include both pages of any applicable Dane County permits. Electronic plans are preferred.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of VeronaFiling instructionsWhere to fileTown Building InspectionEmail the building permit packet

Email the packet to buildinginspection@town.verona.wi.us or mail or drop it off at Town Hall, 7669 County Highway PD, Verona, WI 53593.

Download the Town of Verona application (PDF)Separate county zoning: Email the county zoning packet
What to include
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of ViennaZoning instructionsWhere to fileGeneral Engineering Company · Kelly GreenCall Vienna’s building inspectorDownload Vienna’s general building permit form (PDF)

Use Vienna’s General Building Permit form. Call Kelly Green at General Engineering Company to confirm how to deliver it.

Confirm how to submit the completed packet.

Separate county zoning: Email the county zoning packet
What to include
  • Project description, building plans, site plan and applicable approvals.
County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Town of WestportDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of YorkZoning instructionsWhere to fileTown of York ClerkCall the Town of York clerk

Ask the Dane County Town of York clerk who accepts deck building permits for your parcel.

Confirm whether your deck needs a separate building permit and who issues it.

Separate county zoning: Email the county zoning packet
What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

County zoning packet
  • Signed rural zoning application and permit fee.
  • Scaled site plan with existing and proposed structures, lot lines, setbacks, and well and septic locations where applicable.
  • Deck dimensions and any town approval the county requires.
Local rules

Some towns require their own review first. If construction is within 10 feet of a required setback, check the county’s location survey requirements.

Wisconsin deck code
Village of BellevilleConfirm with officeWhere to fileGeneral Engineering Company · Village of Belleville building permitCall General Engineering Company · 608-745-4070Download Belleville’s general building permit application (PDF)

Use the village’s General Building Permit Application. Confirm whether to submit the deck packet to the village or directly to General Engineering Company.

Ask which office accepts the application and drawings.

What to include
  • General building permit application with project and parcel information, building plans and a site plan.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Black EarthDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-444-0372

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Blue MoundsDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-437-1430

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of BrooklynFiling instructionsWhere to fileVillage Clerk for zoning · General Engineering Company for building permitsCall the Village Clerk to start zoning review

For a deck addition, call the Village Clerk at 608-455-4201 and send the site and building plans to the clerk’s office. After village zoning approval, apply to General Engineering Company.

Start the building permit application
What to include
  • Site plan locating the proposed deck.
  • Building plans to the Village Clerk for zoning review.
Local rules

Village zoning review comes first for additions. Deliver or mail plans to the clerk at 210 Commercial Street, PO Box 189, Brooklyn, WI 53521, or email the clerk using the village instructions. Village zoning and building permit instructions

Wisconsin deck code
Village of CambridgeDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-617-5691

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Cottage GroveDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Cross PlainsDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-444-0372

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of DaneDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of DeerfieldDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-576-6371

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of DeforestDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-846-6751

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Maple BluffDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-230-7651

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of MarshallDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-655-4017

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of MazomanieDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-444-0372

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of McfarlandDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Mount HorebDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-558-6055

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of OregonDirectory contactWhere to fileState-listed inspectorCall listed inspector · 414-639-6814

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of RockdaleDirectory contactWhere to fileMunicipal clerkCall municipal clerk · 608-423-1497

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of Shorewood HillsDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of WaunakeeDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of WindsorDirectory contactWhere to fileState-listed inspectorCall listed inspector · 608-742-2169

Ask where to send the building permit application for this address.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code

When the county reviews a deck

Dane County reviews zoning projects in the rural areas it regulates. Cities and villages handle their own zoning. Check with the county and town to identify who reviews your parcel.

Dane County parcel records

Where to file
Use the county zoning application where the county handles zoning. Get that approval before obtaining the town building permit. Some towns review the site plan before the county issues zoning approval. Dane County zoning application instructions
What to prepare
  • Signed, scaled site plan showing the lot lines, existing and proposed structures, and setbacks.
  • Show the well and septic system if present. Confirm which drawings and elevations are needed for the deck.
  • The county calls for a location survey when the project is within 10 feet of a required setback.