Skip to content
DeckDraft
Wisconsin deck permits

Deck permits in Green County

Check Green County zoning first where it applies, then find the inspector or village office that accepts your deck building permit.

Official sources checked

On this page

Municipal permit index

Select the city, village or town on the parcel record for the permit rules and drawing checklist. Search by municipality

MunicipalityWhere to fileWhat to includeLocal rules
City of BrodheadFiling instructionsWhere to file3C Inspect LLC, Brodhead Building InspectorStart the WiPermit application

Start the building permit application in WiPermit for the City of Brodhead. The city uses the same inspector for city addresses in Green and Rock counties.

Email the building inspector about plans or the low-deck exception
What to include
  • Complete one WiPermit application for the project. List the contractors and their license numbers, as applicable.
  • Prepare deck plans and a scaled plot plan showing the proposed deck, existing structures, lot dimensions, and setbacks. Show deck height above adjacent grade.
  • Brodhead’s code specifies a minimum plan scale of ¼ inch to 1 foot. Confirm the plan copy count and delivery method with 3C Inspect.
Forms and instructions
Local rules

For an uncovered wood deck with its floor less than 24 inches above adjacent grade, ask 3C Inspect whether the inspector will authorize it without a building permit.

The city counts decks as part of a structure for zoning. The building inspector also serves as zoning administrator. Confirm setbacks and whether your project needs a zoning permit, even if the inspector waives the building permit. Brodhead zoning permits and site sketch rules

Official local requirementsWisconsin deck code
City of MonroeFiling instructionsWhere to fileCity of Monroe Building InspectorOpen Monroe’s online building permit

The city accepts building applications online. Open the city’s permit page, read the terms, and select “Building Permit Form.”

Ask whether the inspector will waive the printed plan sets for your deck. Call the city building inspector

What to include
  • Include the applicable contractor license numbers and plans and specifications for the work.
  • City code calls for a PDF and three identical printed sets when plans are required, unless the inspector waives the printed copies.
Forms and instructions
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Town of AdamsConfirm with officeWhere to fileTown of Adams clerk · Green CountyCall the Town of Adams clerk

The county’s residential inspector list and an inspection provider’s service list identify different offices. Confirm the current deck building permit office with the town clerk.

Ask which inspector accepts deck applications for the parcel.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of AlbanyFiling instructionsWhere to file3C Inspect · Town of Albany building inspectorStart the WiPermit application

File online through WiPermit. Select Town of Albany in Green County.

What to includeLocal rules

The town directs construction over 100 square feet to Green County for a zoning and land use permit. Green County zoning application steps (PDF)

Wisconsin deck code
Town of BrooklynFiling instructionsWhere to file3C Inspect · Town of Brooklyn building inspectorStart the WiPermit application

Submit through WiPermit. Select Town of Brooklyn in Green County.

What to include
  • Use the town’s 3C Plan Submittals instructions to check which plans to upload for your project.
Local rules

The town directs projects over 100 square feet to Green County for a zoning and land use permit. Check with the county for approval before the town building permit. Green County zoning application steps (PDF)

Wisconsin deck code
Town of CadizConfirm with officeWhere to file3C Inspect · county-listed residential inspectorCall 3C Inspect · 608-558-6055

Green County lists Ryan Lindsey for residential building permits in the Town of Cadiz. Confirm the filing method for your deck with the inspector.

Ask whether the deck application is accepted online and which drawings to include.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of ClarnoConfirm with officeWhere to fileBrian Flannery · county-listed residential inspectorCall the residential building inspector · 608-558-1833

Green County lists Brian Flannery as the Town of Clarno residential building inspector. Confirm how to deliver your deck application and drawings.

Ask which form to use and where to deliver it.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of DecaturConfirm with officeWhere to fileBrian Flannery · Town of Decatur building inspectorCall the town building inspector · 608-558-1833

The town identifies Brian Flannery as the building inspector. Confirm how to deliver your deck application and drawings.

Give the inspector the parcel address and ask which permit form applies to the deck.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of ExeterConfirm with officeWhere to fileBrian Flannery · Town of Exeter building inspectorEmail the town building inspectorGet the town building permit application

Use the application linked by the town. The town identifies Brian Flannery as the building inspector. Confirm how to deliver the deck application and plans with him.

Ask which site and framing drawings to send with the form.

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of JeffersonFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of JordanFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of MonroeFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of Mount PleasantFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of New GlarusFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Download the town’s permit form (PDF)
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of Spring GroveFiling instructionsWhere to file3C Inspect · Town of Spring Grove building inspectorStart the WiPermit application

Start the permit application in WiPermit. Select Town of Spring Grove in Green County.

What to include
  • Use the town’s 3C Plan Submittal and Required Inspections documents to prepare your plans and schedule inspections.
Local rules

The town directs projects for structures over 100 square feet to Green County for a zoning and land use permit. Check with the county for approval before the town building permit. Green County zoning application steps (PDF)

Wisconsin deck code
Town of SylvesterFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of WashingtonFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Town of YorkFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Where county zoning applies, Green County directs applicants to get zoning approval before obtaining the town building permit. Bring your parcel number and a sketch showing the work and distances to lot lines, the road, existing buildings and septic system. Green County zoning application steps (PDF)

Wisconsin deck code
Village of AlbanyConfirm with officeWhere to fileVillage of Albany code officialCall listed inspector · 608-558-1833Download the village building permit application (PDF)

Use the village’s Uniform Application for Permit. The village asks applicants to contact its code official before submitting to confirm the required documents.

What to include
  • For deck, patio, porch, or sunroom work, complete sections 1 through 11, 14, and 15.
  • Complete the owner cautionary statement where it applies.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of BellevilleConfirm with officeWhere to fileGeneral Engineering Company · Village of Belleville building permitCall General Engineering Company · 608-745-4070Download Belleville’s general building permit application (PDF)

Use the village’s General Building Permit Application. Confirm whether to submit the deck packet to the village or directly to General Engineering Company.

Ask which office accepts the application and drawings.

What to include
  • General building permit application with project and parcel information, building plans and a site plan.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of BrooklynFiling instructionsWhere to fileVillage Clerk for zoning · General Engineering Company for building permitsCall the Village Clerk to start zoning review

For a deck addition, call the Village Clerk at 608-455-4201 and send the site and building plans to the clerk’s office. After village zoning approval, apply to General Engineering Company.

Start the building permit application
What to include
  • Site plan locating the proposed deck.
  • Building plans to the Village Clerk for zoning review.
Local rules

Village zoning review comes first for additions. Deliver or mail plans to the clerk at 210 Commercial Street, PO Box 189, Brooklyn, WI 53521, or email the clerk using the village instructions. Village zoning and building permit instructions

Wisconsin deck code
Village of BrowntownFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Download Browntown’s building permit form (PDF)
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of MonticelloFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code
Village of New GlarusFiling instructionsWhere to fileTotal Inspection Services · contracted building inspectorEmail the completed application

Download the permit form and email the completed PDF to Total Inspection Services. Put the municipality and job address in your email.

Get the inspector’s permit form
What to include
  • Completed permit form with the owner, project location, contractor and work description.
  • The inspector’s filing page gives the form and delivery method. Ask which site and construction drawings to attach for your deck.
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

County zoning informationWisconsin deck code

When the county reviews a deck

Green County publishes zoning instructions and a residential building inspector list for its towns. Cities and villages publish their own building permit directions. Use the parcel record to distinguish the Town of Brooklyn from the Village of Brooklyn.

Green County parcel records · County list of town building inspectors (PDF)

Where to file
Where county zoning applies, call 608-328-9423 to arrange county review. Obtain county approval before getting the town building permit. Use the municipality list below for the building permit submission route. Green County zoning permit steps (PDF)
What to prepare
  • Parcel number and a certified survey map or legal description.
  • A sketch of the deck location and size with distances to lot lines, the road, other buildings and the septic system.
  • Project plans if available. Check with the building inspector for the separate deck plan packet.