Skip to content
DeckDraft
Wisconsin deck permits

Deck permits in Ashland County

Find the county deck permit packet, the town office for Madeline Island, and the city filing route for Ashland.

Official sources checked

On this page

Municipal permit index

Select the city, village or town on the parcel record for the permit rules and drawing checklist. Search by municipality

MunicipalityWhere to fileWhat to includeLocal rules
City of AshlandFiling instructionsWhere to fileCity of Ashland Planning & DevelopmentOpen Ashland’s building permit portal

Submit the building permit application through the city’s iWorQ portal. The same city office serves city parcels in Ashland and Bayfield counties.

If the portal will not open, contact Planning & Development to arrange a permit appointment. The office is on the second floor of City Hall, 601 Main St W. Call the city permit office · 715-682-7041

Download the city building permit application (PDF)
What to include
  • Use the Residential Remodeling, Repairs, or Additions category on the city application. The city lists structural deck work under that category regardless of cost.
  • Include the job address, owner and applicant information, contractor details as applicable, estimated project cost, start date, and a description of the work.
  • Prepare a site plan and dimensioned deck drawings. Ask the city which sheets it wants for your deck.
Forms and instructions
Local rules

The city’s application lists a $50 flat deck fee and directs applicants to wait for Planning & Development to confirm the amount before paying. The city doubles the fee if work begins before a required permit is issued.

The city ordinance uses the house’s required front, street-side, and side setbacks for decks. At the rear, use the house’s required setback up to a maximum required deck setback of 25 feet. Confirm your zoning district and any overlay with the city. City deck setbacks · Unified Development Ordinance (PDF)

Official local requirementsWisconsin deck code
City of MellenConfirm with officeWhere to fileCity of Mellen ClerkCall Mellen City Hall

Start with the City Clerk at 102 East Bennett Ave. Request the city deck application, the plan requirements and where to file. Ask about floodplain review for the parcel.

Ask for the deck permit form, where to send it, and the required construction sheets and zoning approvals. Email the Mellen City Clerk

What to include

Have the job address and scope ready. Ask whether to send a site plan, framing plan, elevations, and connection details. Wisconsin drawing checklist

Forms and instructions
Local rules

Local deck rules need confirmation. Ask about setbacks and separate zoning review.

Wisconsin deck code
Town of AgendaZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of AshlandZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The Town of Ashland directs applicants to the clerk to check project-specific town permits. Ask whether your deck also needs construction review. Email the Town of Ashland clerk

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of ChippewaTown permit instructionsWhere to fileTown of Chippewa ClerkDownload the Town of Chippewa building permit form (PDF)

Mail the town’s property-improvement building permit form to Town of Chippewa, PO Box 276, Butternut, WI 54514, for the clerk’s approval.

What to includeFor the town permit
  • Owner name and address, property legal description and parcel number, improvement description and estimated value.
Local rules

The town form states that its permit is free and identifies county approval as separate. Check with the town and county about any additional construction drawings or approvals for the deck.

Check with County Zoning about any separate parcel, shoreland or floodplain review. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of GinglesTown permit instructionsWhere to fileTown of Gingles Clerk · Town BoardDownload the Gingles deck permit application (PDF)

Give the Town Clerk the completed application and $30 check before the monthly board meeting. Call 715-685-8452 to arrange delivery. The town advises applicants to attend the meeting.

The town form covers its administrative permit. Ask the clerk about any separate structural inspection. Call the Gingles clerk

Fee: $30 town fee. Make the check payable to the Town of Gingles Treasurer.

What to includeFor the town permit
  • Signed form with the job address, legal description, estimated cost, and construction and foundation information.
  • Sketch showing the deck, lot size and setbacks.
Local rules

The town lists a 40 ft setback from the edge of the road right-of-way and 25 ft from side lot lines. The town permit lasts one year.

Check with County Zoning about any separate parcel, shoreland or floodplain review. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of GordonZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of JacobsZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of La PointeConfirm with officeWhere to fileTown Building Inspector · Town Planning & ZoningRequest the La Pointe building permit packet

Request the building permit packet from Town Building Inspector Stephen Schraufnagel. He issues the building permit and collects the building and inspection fees. Mail or deliver the separate land-use packet to Town Zoning at 240 Big Bay Rd, PO Box 270, La Pointe, WI 54850.

Ask where to return the completed building packet and which construction drawings to include. Call the town building inspector

Download the town land-use application (PDF)
What to includeFor land use
  • For land use, submit the original application signed by all owners, dimensioned plot plan, fee and any owner authorization for an agent. The town requires paper originals and asks you to stake the site for inspection.
  • For building review, request the packet and drawing requirements from the inspector.
Local rules

The town may double fees if work begins before the permit is issued. Use Town Zoning for applicable county shoreland and floodplain review on Madeline Island.

Town code § 205-10 adopts Wisconsin UDC SPS 320–325.

The town administers county shoreland and floodplain rules on Madeline Island. Its instructions direct projects within 1,000 feet of the lakeshore to the Town Zoning office for the county application first. Town shoreland and floodplain review

Official local requirementsWisconsin deck code
Town of MarengoZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The town FAQ and its newer comprehensive plan describe different permitting arrangements. Ask the town clerk which office currently handles structural review for existing-home decks. Find the Marengo town clerk

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of MorseZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of PeeksvilleZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of SanbornTribal project reviewWhere to fileBuilding filing to confirmBad River Mashkiiziibii Natural Resources Department · project reviewStart the Bad River Preliminary Project Review

Start with the Tribe’s Preliminary Project Review for residential additions. The Town of Sanborn lies within the Bad River Reservation. Call 715-682-7123 if you need help with the form.

Building permit: Ask which Tribal, county or town approvals are required for this parcel and whether a separate construction permit applies. Call Bad River Natural Resources

What to includeFor Tribal project review
  • Parcel ID, site address, and a map showing the parcel boundary and proposed deck location.
  • Dimensioned site sketch, work description, approximate start and end dates, and an email for the project contact.
  • Describe any related grading or tree removal and identify known wetlands or waterways.
Forms and instructions
Local rules

The Tribe’s review applies throughout the reservation regardless of land ownership. Preliminary review can determine whether a remodel qualifies for an exemption from further review.

Ask the Tribe and County Zoning which land-use rules apply to your parcel before filing with the county. Ashland County Zoning

Official local requirementsWisconsin deck code
Town of ShanagoldenZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Town of White RiverZoning instructionsWhere to fileBuilding filing to confirmAshland County Zoning AdministrationDownload the Ashland County permit application (PDF)

Send the county permit application and fee to Zoning Administration, 201 W Main St, Room 109, Ashland, WI 54806. The county lists decks among projects that require a permit in areas it regulates.

Building permit: The county lists T.A.K. Inspections for new homes. Ask the inspector and town whether an existing-home deck needs a separate building permit and how to file it. Call the county-listed inspector

What to includeFor zoning
  • Owner-signed county application with the parcel number and legal description from the tax bill.
  • Site sketch locating the deck, existing buildings, lot lines, road, and any nearby water or septic components. Show dimensions and setbacks.
  • Owner signature and date on any separate plans. Include the fee and ask County Zoning which permit category applies to your deck.
Forms and instructions
Local rules

Where county shoreland zoning applies, the usual setback is 75 ft from the ordinary high-water mark. Section 7.2(3) allows qualifying open or screened decks at least 35 ft back, with a 200 sq. ft. combined limit, an approved vegetation plan and a recorded affidavit.

Ask County Zoning about the parcel’s setbacks and any shoreland or floodplain requirements. Ashland County zoning and shoreland information

Official local requirementsWisconsin deck code
Village of ButternutConfirm with officeWhere to fileVillage of Butternut Clerk-Treasurer · Village Building InspectorCall the Butternut Clerk-Treasurer

Request the current building permit form from the Clerk-Treasurer at Village Hall, 301 Michigan St. The posted village code directs applicants to file with the Village Building Inspector. Confirm the current inspector and delivery method with the clerk.

Ask for the current deck application, plan requirements and fees. Email the Butternut Clerk-Treasurer

What to include
  • The posted code calls for owner and parcel information, two signed sets of plans and specifications, and a plot plan locating the deck, lot lines and existing structures. Verify the current packet with the village.
Forms and instructions
Local rules

The posted code also calls for a separate land-use application with two copies of a scaled site sketch for covered structural alterations. Confirm current requirements with the village.

Official local requirementsWisconsin deck code

When the county reviews a deck

Ashland County Zoning lists decks among projects requiring permits in areas it regulates. The City of Ashland has a city building permit process. The Town of La Pointe handles town and applicable county zoning approvals on Madeline Island.

Ashland County parcel records

Where to file
For a county permit, submit the application and fee to County Zoning at 201 W Main St, Room 109, Ashland. On Madeline Island, send the packet to Town of La Pointe Zoning. Check with the municipality and inspector about separate building review. Ashland County Zoning permits and contact information
What to prepare
  • Owner-signed permit application with the parcel information from the tax bill.
  • Dimensioned site sketch with the proposed deck, existing buildings, setbacks, and applicable water or septic features.
  • Fee and any required plans signed and dated by the owner.