Skip to content
DeckDraft
Builder resources

Oregon deck permits

For an uncovered deck, check the ground within 3 feet of the walking surface. If the drop exceeds 30 inches anywhere in that strip, the deck falls outside Oregon’s low-deck permit exemption.

Official sources checked

On this page

Where to start in Oregon

Oregon’s directory lists the building department for each city and town. For a property outside city limits, look up the county. The local office handles permit and setback questions for the address.

Portland plans for a sloping lot

Portland asks for three drawings with a deck permit application. The site plan locates the deck on the lot, the framing plan shows its supports, and the elevation shows how far the ground drops beneath it.

Deck height
Portland’s guide calls for a measurement 36 inches from the edge. Oregon’s permit rule covers every point within that distance. Include any low spot between the edge and the 36-inch mark, especially beside stairs or a retaining wall.
Site plan and elevation
Mark grade elevations at the lot corners and building corners on the site plan. On the elevation, draw the finished ground line under the deck and dimension the height from grade to the walking surface.
Framing plan
Portland’s standard plans cover a rectangular, single-level wood deck attached to the house, with one outer row of posts and single-span joists. Sheet S1 lists the limits, including heavy finishes and hot tubs. For a custom design outside the code’s prescriptive provisions, submit calculations with the drawings.
Covered decks
Portland counts a roofed deck toward building coverage. Check the roofed footprint against the setbacks. Label the roof and siding materials on the elevation.

Local filing requirements

Portland

  • In PortlandMaps, open Permits & Zoning for the address and check the base zone and overlays. Even a low, uncovered deck may need a zoning permit in an environmental, greenway or river overlay.
  • In DevHub, select Building Permit Request and enter the address or property ID. Save the IVR number from the confirmation. You’ll use it to check status and book inspections.

Eugene

  • Eugene requires a building permit if any part of the deck is more than 30 inches above ground. Show the lot lines, contours, house and outbuildings on the site plan. Check with Public Works if a proposed footing is near a public utility easement.
  • Upload the foundation plan, framing plan, elevations and a section with connection details to eBuild. Follow the city’s residential file naming rules. For composite decking, attach the manufacturer’s specifications.

Front elevation on a sloping lot

Front elevation of a covered deck with tall posts at the downhill end and short stairs at the uphill end.Open sheet 5 at full size (PDF)

At the downhill end, the deck surface is 9 feet 11 inches above the grade shown. The stairs land on higher ground at the right. These dimensions are taken at the deck face.